The typical pipe hanger fabrication and installation process usually includes the following steps: First, according to the engineering design requirements and pipe size, confirm the type and number of hangers required. Then, according to the installation position and requirements of the support and hanger, the on-site measurement and marking are carried out, and the accurate installation position of the support and hanger is determined. Next, according to the design requirements and labeling, production of hanger components. In the production process, it is necessary to ensure the quality of the material and the accuracy of the size. Then, the fabricated supports and hangers are pre-installed to ensure the accuracy and reliability of the installation. Finally, the installation of the hanger is carried out. During the installation process, it is necessary to use correct tools and methods to fix and adjust the supports and hangers according to the marking and design requirements. After the installation is completed, inspection and testing are required to ensure the installation quality of the support and hanger. During the entire production and installation process, it is necessary to pay attention to safety measures to ensure the personal safety of construction personnel. At the same time, it is also necessary to comply with relevant construction specifications and standards to ensure the quality and reliability of pipeline supports and hangers.

RELATED INFORMATION

Importance of setting pipe supports and hangers

2023-08-31

Importance of setting pipe supports and hangers

We know that the main purpose of piping is to complete the specific pipeline connection between the nozzle of the equipment or with other terminals according to the process flow chart, so as to realize the transportation of process materials through the pipeline to the relevant equipment or terminal. In other words, the pipeline layout design should meet the requirements of the process. After the purpose is clear, it is necessary to abide by certain rules, so that the piping meets certain requirements in the process of achieving the purpose, not just "pulling the pipe.


View Details

Calculation, Selection and Installation of Support and Hanger for Large Pipeline

2023-08-07

Calculation, Selection and Installation of Support and Hanger for Large Pipeline

Difficulty: the pipeline system is complex, the support forms are various, the selection is difficult to grasp, and the support is easy to deform and cause hidden dangers;


View Details

Changzhou Wujin Wunan Pipeline Equipment Co., Ltd. 2022 Quality Credit Report

2023-04-15

Changzhou Wujin Wunan Pipeline Equipment Co., Ltd. 2022 Quality Credit Report

The quality credit report issued by the Company is prepared with reference to the Guidelines for the Preparation of Enterprise Quality Credit Reports (GB/T 31870-2015). The report on the company's quality integrity and quality management is a true reflection of the company's current situation, the company is responsible for the objectivity of the report content, responsible for the authenticity of the relevant statements and conclusions. Report Scope: The scope of this report is Changzhou Wujin Wunan Pipeline Equipment Co., Ltd. This report describes the company's philosophy, system, measures taken and performance in quality management, product liability, quality credit management, etc. from January to December 2022. Report Release Form: In principle, the quality credit report is published regularly once a year, in electronic form.


View Details

Selection Principle and Installation Process 230102 of Pipe Support and Hanger

2023-03-23

Selection Principle and Installation Process 230102 of Pipe Support and Hanger

When selecting pipe supports and hangers, suitable supports and hangers should be selected according to the load size and direction of the supporting point, the displacement of the pipeline, the working temperature, whether heat preservation or cold preservation, and the material of the pipeline.


View Details